Projects portfolio-site Docs audit-2026-03-23.md

Portfolio Site — Audit Report

Last modified March 23, 2026

Portfolio Site — Audit Report

Date: 2026-03-23 Auditor: Claude (automated) Project status: Active — MVP built, not yet deployed


Summary

  • Total features: 41
  • DONE: 31 (MVP complete)
  • PLANNED: 4 (v2 — Go Live)
  • BACKLOG: 6 (v3 — Rich Portfolio)
  • Documentation before audit: 0 README.md files
  • Documentation after audit: 41 README.md files created

Audit by Area

Homepage — 6/6 features documented

Feature Status Documentation Missing
Hero section DONE Complete
Services grid DONE Complete
Featured projects grid DONE Complete
Skills grid DONE Complete
Work history timeline DONE Complete
Contact CTA section DONE Complete

Project Pages — 9/9 features documented

Feature Status Documentation Missing
Project detail pages DONE Complete
Viewport gallery DONE Complete
Lightbox overlay DONE Complete
Live embed component DONE Complete
System specs component DONE Complete
Terminal link component DONE Complete
Add more projects PLANNED Partial Needs: project selection
Inline images per feature BACKLOG Partial Needs: design spec
Project data stats section BACKLOG Partial Needs: design spec

Blog — 3/3 features documented

Feature Status Documentation Missing
Blog listing page DONE Complete
Blog post pages DONE Complete
Blog post card component DONE Complete

Design & Theme — 5/5 features documented

Feature Status Documentation Missing
Dark theme with gold accents DONE Complete
Responsive layout DONE Complete
404 page DONE Complete
Header navigation DONE Complete
Footer DONE Complete

Content System — 4/4 features documented

Feature Status Documentation Missing
File-based content model DONE Complete
Content collections config DONE Complete
Base layout DONE Complete
UI components DONE Complete

Capture System — 4/4 features documented

Feature Status Documentation Missing
Playwright automation framework DONE Complete
Per-product capture scenarios DONE Complete
Desktop capture script DONE Complete
Generate real media assets PLANNED Partial Needs: live apps running

Deployment & Infrastructure — 5/5 features documented

Feature Status Documentation Missing
Build and rsync deploy script DONE Complete
Caddyfile with automatic HTTPS DONE Complete
VPS setup guide DONE Complete
Pick domain and deploy PLANNED Partial Needs: domain decision
Add analytics PLANNED Partial Needs: provider decision

Client Funnel — 6/6 features documented

Feature Status Documentation Missing
Employer cross-links DONE Complete
Version/changelog system BACKLOG Partial Needs: design spec
Public backlog per project BACKLOG Partial Needs: integration spec
Current job spotlight BACKLOG Partial Needs: content plan
Hire-me availability indicator BACKLOG Partial Needs: design spec

Documentation Health

Area Features DONE PLANNED BACKLOG Doc Coverage
Homepage 6 6 0 0 100% (full 5-layer)
Project Pages 9 6 1 2 67% full, 33% partial
Blog 3 3 0 0 100% (full 5-layer)
Design & Theme 5 5 0 0 100% (full 5-layer)
Content System 4 4 0 0 100% (full 5-layer)
Capture System 4 3 1 0 75% full, 25% partial
Deployment & Infrastructure 5 3 2 0 60% full, 40% partial
Client Funnel 6 1 0 5 17% full, 83% partial

Recommendations

  1. MVP is fully documented — all 31 DONE features have complete 5-layer READMEs
  2. Top priority: Pick a domain and deploy (v2) — infrastructure is ready, just needs DNS
  3. Quick wins: "Add more projects" just requires dropping .md files in content dir
  4. No screenshots captured — site not yet deployed; screenshots should be added post-launch
  5. Client Funnel area has the most backlog — consider prioritizing public backlog and availability indicator for maximum client conversion impact