Portfolio Site — Audit Report
Date: 2026-03-23
Auditor: Claude (automated)
Project status: Active — MVP built, not yet deployed
Summary
- Total features: 41
- DONE: 31 (MVP complete)
- PLANNED: 4 (v2 — Go Live)
- BACKLOG: 6 (v3 — Rich Portfolio)
- Documentation before audit: 0 README.md files
- Documentation after audit: 41 README.md files created
Audit by Area
Homepage — 6/6 features documented
| Feature |
Status |
Documentation |
Missing |
| Hero section |
DONE |
Complete |
— |
| Services grid |
DONE |
Complete |
— |
| Featured projects grid |
DONE |
Complete |
— |
| Skills grid |
DONE |
Complete |
— |
| Work history timeline |
DONE |
Complete |
— |
| Contact CTA section |
DONE |
Complete |
— |
Project Pages — 9/9 features documented
| Feature |
Status |
Documentation |
Missing |
| Project detail pages |
DONE |
Complete |
— |
| Viewport gallery |
DONE |
Complete |
— |
| Lightbox overlay |
DONE |
Complete |
— |
| Live embed component |
DONE |
Complete |
— |
| System specs component |
DONE |
Complete |
— |
| Terminal link component |
DONE |
Complete |
— |
| Add more projects |
PLANNED |
Partial |
Needs: project selection |
| Inline images per feature |
BACKLOG |
Partial |
Needs: design spec |
| Project data stats section |
BACKLOG |
Partial |
Needs: design spec |
Blog — 3/3 features documented
| Feature |
Status |
Documentation |
Missing |
| Blog listing page |
DONE |
Complete |
— |
| Blog post pages |
DONE |
Complete |
— |
| Blog post card component |
DONE |
Complete |
— |
Design & Theme — 5/5 features documented
| Feature |
Status |
Documentation |
Missing |
| Dark theme with gold accents |
DONE |
Complete |
— |
| Responsive layout |
DONE |
Complete |
— |
| 404 page |
DONE |
Complete |
— |
| Header navigation |
DONE |
Complete |
— |
| Footer |
DONE |
Complete |
— |
Content System — 4/4 features documented
| Feature |
Status |
Documentation |
Missing |
| File-based content model |
DONE |
Complete |
— |
| Content collections config |
DONE |
Complete |
— |
| Base layout |
DONE |
Complete |
— |
| UI components |
DONE |
Complete |
— |
Capture System — 4/4 features documented
| Feature |
Status |
Documentation |
Missing |
| Playwright automation framework |
DONE |
Complete |
— |
| Per-product capture scenarios |
DONE |
Complete |
— |
| Desktop capture script |
DONE |
Complete |
— |
| Generate real media assets |
PLANNED |
Partial |
Needs: live apps running |
Deployment & Infrastructure — 5/5 features documented
| Feature |
Status |
Documentation |
Missing |
| Build and rsync deploy script |
DONE |
Complete |
— |
| Caddyfile with automatic HTTPS |
DONE |
Complete |
— |
| VPS setup guide |
DONE |
Complete |
— |
| Pick domain and deploy |
PLANNED |
Partial |
Needs: domain decision |
| Add analytics |
PLANNED |
Partial |
Needs: provider decision |
Client Funnel — 6/6 features documented
| Feature |
Status |
Documentation |
Missing |
| Employer cross-links |
DONE |
Complete |
— |
| Version/changelog system |
BACKLOG |
Partial |
Needs: design spec |
| Public backlog per project |
BACKLOG |
Partial |
Needs: integration spec |
| Current job spotlight |
BACKLOG |
Partial |
Needs: content plan |
| Hire-me availability indicator |
BACKLOG |
Partial |
Needs: design spec |
Documentation Health
| Area |
Features |
DONE |
PLANNED |
BACKLOG |
Doc Coverage |
| Homepage |
6 |
6 |
0 |
0 |
100% (full 5-layer) |
| Project Pages |
9 |
6 |
1 |
2 |
67% full, 33% partial |
| Blog |
3 |
3 |
0 |
0 |
100% (full 5-layer) |
| Design & Theme |
5 |
5 |
0 |
0 |
100% (full 5-layer) |
| Content System |
4 |
4 |
0 |
0 |
100% (full 5-layer) |
| Capture System |
4 |
3 |
1 |
0 |
75% full, 25% partial |
| Deployment & Infrastructure |
5 |
3 |
2 |
0 |
60% full, 40% partial |
| Client Funnel |
6 |
1 |
0 |
5 |
17% full, 83% partial |
Recommendations
- MVP is fully documented — all 31 DONE features have complete 5-layer READMEs
- Top priority: Pick a domain and deploy (v2) — infrastructure is ready, just needs DNS
- Quick wins: "Add more projects" just requires dropping
.md files in content dir
- No screenshots captured — site not yet deployed; screenshots should be added post-launch
- Client Funnel area has the most backlog — consider prioritizing public backlog and availability indicator for maximum client conversion impact