SynergyCore — Audit Report

Last modified March 23, 2026

SynergyCore — Audit Report

Date: 2026-03-23 Auditor: Claude (automated) Project status: Active — v0.5.0, backtester complete, exit architecture redesign pending


Summary

  • Total features: 41
  • DONE: 37 (v1 backtester & analysis complete)
  • PLANNED: 2 (v2 — exit architecture)
  • BACKLOG: 2 (v3 — live trading)
  • Documentation before audit: 0 SynergyPlan feature docs (project has state_of_the_system.md and decisions.md internally)
  • Documentation after audit: 41 README.md files created

Audit by Area

Backtesting Engine — 5/5 features documented

Feature Status Documentation Missing
Momentum engine DONE Complete
Execution simulator DONE Complete
Timeframe consolidation DONE Complete
Backtest metrics computation DONE Complete
Equity curve tracking DONE Complete

Phase Detection & Regime — 4/4 features documented

Feature Status Documentation Missing
Phase labeling DONE Complete
Regime classification DONE Complete
Oracle system DONE Complete
Key level detection DONE Complete

Indicators & Signals — 6/6 features documented

Feature Status Documentation Missing
Indicator registry DONE Complete
Momentum signal evaluation DONE Complete
CVD tracking DONE Complete
Relative volume tracking DONE Complete
Taker ratio tracking DONE Complete
HTF confluence tracking DONE Complete

Market Data — 4/4 features documented

Feature Status Documentation Missing
Market data fetching DONE Complete
Parquet storage DONE Complete
CSV import DONE Complete
Candle validation DONE Complete

Sentiment Integration — 2/2 features documented

Feature Status Documentation Missing
Core sentiment loaders DONE Complete
Extended sentiment loaders DONE Complete

Risk Management — 4/4 features documented

Feature Status Documentation Missing
Stop-loss and trailing stop DONE Complete Known issue: fires too early
Position sizing DONE Complete
Circuit breaker DONE Complete
Trade cooldown DONE Complete

Terminal Dashboard — 4/4 features documented

Feature Status Documentation Missing
Candlestick chart rendering DONE Complete
Phase overlay and trade markers DONE Complete
Inspector mode DONE Complete
Settings panel DONE Complete

CLI & Configuration — 3/3 features documented

Feature Status Documentation Missing
CLI commands DONE Complete
YAML configuration system DONE Complete
FastAPI dashboard server DONE Complete

Database & Persistence — 2/2 features documented

Feature Status Documentation Missing
SQLite experiment database DONE Complete
Result and artifact storage DONE Complete

Observability — 2/2 features documented

Feature Status Documentation Missing
Trace and decision logging DONE Complete
Entry and exit context logging DONE Complete

Testing — 1/1 features documented

Feature Status Documentation Missing
Unit and integration test suite DONE Complete

Exit Architecture — 2/2 features documented

Feature Status Documentation Missing
Multi-mechanism exit system PLANNED Partial Needs: implementation of D-012
Signal-based exit rules PLANNED Partial Needs: rule engine implementation

Live Trading — 2/2 features documented

Feature Status Documentation Missing
Paper trading framework BACKLOG Partial Needs: full design
Live Binance deployment BACKLOG Partial Needs: infra design

Documentation Health

Area Features DONE PLANNED BACKLOG Doc Coverage
Backtesting Engine 5 5 0 0 100% (full 5-layer)
Phase Detection & Regime 4 4 0 0 100% (full 5-layer)
Indicators & Signals 6 6 0 0 100% (full 5-layer)
Market Data 4 4 0 0 100% (full 5-layer)
Sentiment Integration 2 2 0 0 100% (full 5-layer)
Risk Management 4 4 0 0 100% (full 5-layer)
Terminal Dashboard 4 4 0 0 100% (full 5-layer)
CLI & Configuration 3 3 0 0 100% (full 5-layer)
Database & Persistence 2 2 0 0 100% (full 5-layer)
Observability 2 2 0 0 100% (full 5-layer)
Testing 1 1 0 0 100% (full 5-layer)
Exit Architecture 2 0 2 0 Context + Functional
Live Trading 2 0 0 2 Context + Functional

Key Findings from Project Research

  • Oracle ceiling +84% at scale 6, 0.5% min-move (very profitable if exits are fixed)
  • Trailing stop is the bottleneck: fires median -4.0 candles early, destroys 75% of winning trades
  • Entry timing is good: median -1.2 candles vs oracle
  • Signal-identified exits: 28.4% WR vs 1.4% without signal — strong evidence for D-012
  • Best entry conditions: news attention z 1-2 (11.3% WR), session 20:00-24:00 UTC (10.5% WR), neutral funding

Recommendations

  1. Critical path is D-012 — multi-mechanism exit system. All V8 research points to this as the profitability unlock
  2. V1 is remarkably complete — 37 of 41 features done, 90% of the system is built
  3. Exit architecture is the smallest amount of work for the largest PnL impact
  4. Paper trading should follow immediately after profitable exits are validated in backtesting